Executing of Dewatering Works for “Area 1” with Appx. area of  1 Million M2

Amount of water required to be transfered is Appx. 2.5 Million M3 of water over a duration of 3 Months

42 Dewatering Pumps will be utilised to execute the job after conducting a pumping test and determining the most appropriate type of pump to be utilised in such a project.